Departed Long Beach · Apr 20, 2026
The window that was originally published, the movement that occurred, and the window that held at departure.
Multiple or material CRW shifts occurred. Drayage plans on this vessel required active adjustment during the final week before ERD.
One or more CRW changes arrived within 72 hours of ERD - after drayage dispatch and container stuffing had begun.
Net movement between the originally published Cargo Receiving Window and the window that held at departure.
| Field | Originally Published | At Departure | Net Shift |
|---|---|---|---|
| ERD | Apr 15, 2026 | Apr 19, 2026 | +4d |
| CY Cut | Apr 16, 2026 | Apr 19, 2026 | +3d |
| Vessel | Voyage | Departure | Stability |
|---|---|---|---|
| ONE MINATO | 0082E | Nov 30, 2025 | Stable |
| ONE RELIABILITY | 0086E | Dec 14, 2025 | Moderate |
| ONE INNOVATION | 0088E | Dec 21, 2025 | Elevated |
This is what vessel schedule behavior looks like from the outside. Ava shows you what it means for your specific shipments.