Departed Tacoma · Mar 26, 2026
The window that was originally published, the movement that occurred, and the window that held at departure.
Multiple or material CRW shifts occurred. Drayage plans on this vessel required active adjustment during the final week before ERD.
One or more CRW changes arrived within 72 hours of ERD - after drayage dispatch and container stuffing had begun.
Net movement between the originally published Cargo Receiving Window and the window that held at departure.
| Field | Originally Published | At Departure | Net Shift |
|---|---|---|---|
| ERD | Mar 17, 2026 | Mar 18, 2026 | +1d |
| CY Cut | Mar 20, 2026 | Mar 24, 2026 | +4d |
No other voyages of HMM DREAM are tracked yet. This is the only voyage in the public set.
| Vessel | Voyage | Departure | Stability |
|---|---|---|---|
| ONE HANGZHOU BAY | 0060 | Jan 6, 2026 | Moderate |
| ONE HANGZHOU BAY | 0060 | Jan 3, 2026 | High |
This is what vessel schedule behavior looks like from the outside. Ava shows you what it means for your specific shipments.