Departed Newark · Mar 8, 2026
The window that was originally published, the movement that occurred, and the window that held at departure.
CRW movement at this terminal usually remains within the planning horizon. Execution risk is generally contained.
Stability tier reflects terminal-level volatility at USEWR-apm-terminal-elizabeth, not this voyage's individual drift. This voyage's own ERD and CY Cut shifts are shown above.
One or more CRW changes arrived within 72 hours of ERD - after drayage dispatch and container stuffing had begun.
Observed schedule behavior based on published carrier and terminal data.
Net movement between the originally published Cargo Receiving Window and the window that held at departure.
| Field | Originally Published | At Departure | Net Shift |
|---|---|---|---|
| ERD | Feb 25, 2026 | Feb 27, 2026 | +2d |
| CY Cut | Mar 2, 2026 | Mar 3, 2026 | +1d |
No other voyages of OSAKA EXPRESS are tracked yet. This is the only voyage in the public set.
| Vessel | Voyage | Departure | Stability |
|---|---|---|---|
| COLOMBO EXPRESS | 607W | Feb 12, 2026 | Moderate |
This is what vessel schedule behavior looks like from the outside. Ava shows you what it means for your specific shipments.
See this on your shipments →